Title
2016-17 Concrete Sidewalk and Curb Repairs, Project 17-06-Approve Plans and Specifications/Authorize Bids.
Recommended Action
1. Transfer and appropriate the remaining balance of approximately $239,300 from 2015-16 Concrete Sidewalk and Curb Repairs, Project 16-06, to 2016-17 Concrete Sidewalk and Curb Repairs, Project 17-06. (Five votes required)
2. Transfer and appropriate the remaining balance of approximately $52,900 from Biennial Installation of ADA Curb Ramps, Project 16-24, to 2016-17 Concrete Sidewalk and Curb Repairs, Project 17-06. (Five votes required)
3. Approve plans and specifications for 2016-17 Concrete Sidewalk and Curb Repairs, Project 17-06, and authorize staff to advertise the project for bid.
4. Authorize the City Manager to award the construction contract to the lowest responsible bidder if the low bid is within the project budget.